$8M+ Federal Contracts30+ Federal & Military Projects5 Armed-Service Branches
In-Line ornamental bridge railing

Proven Where It Counts

The Work Speaks
For Itself.

From military bases and federal facilities to transit, schools, and civic landmarks — self-performed, on spec, on time, clean & complete.

$8M+
Documented Federal Contracts
30+
Federal & Military Projects
5
Armed-Service Branches
35
Years of Performance

Featured Work

Case Studies

Marquee projects across every market we serve. Full scope, references, and CPARS available on request.

Project Case Study · K–12 · Architectural Fabrication

Adams Elementary Whole Site Modernization

Normal Heights, San Diego · Adams Elementary & San Diego Global Vision Academy

Adams Elementary Whole Site Modernization

Custom picket and perforated-panel screen gates at the entry canopy — fabricated to match the campus architectureRead the case study →

Project Case Study · Federal · Aviation

Air Traffic Control Tower Air Force Plant 42

Palmdale, California · U.S. Army Corps of Engineers, Los Angeles District

Air Traffic Control Tower Air Force Plant 42

Commissioning day at the tower access point. Automated cantilever gate, barrier arm, signalling and controlRead the case study →

Project Case Study · Municipal · Architectural Fabrication

Borden Road Bridge Improvement

San Marcos, California · City of San Marcos

Borden Road Bridge Improvement

Borden Road Bridge — framed mesh-infill panels along the outboard barrier and a curved baluster rail on the roadwayRead the case study →

Project Case Study · Higher Education · Aluminum Fabrication

Cabrillo College Pedestrian Bridge

Aptos, California · Cabrillo Community College District

Cabrillo College Pedestrian Bridge

The rebuilt bridge — aluminum guardrail with grating infill above a solid fascia, running the full length of the spanRead the case study →

Project Case Study · U.S. Navy · NAVFAC Southwest

Child Development Center, Chollas Heights

P-772V · San Diego, California · Naval Facilities Engineering Command Southwest

Child Development Center, Chollas Heights

The completed entry at the Chollas Heights Child Development Center — electrically operated vehicle barrier arms,Read the case study →

Project Case Study · School District · Structural Steel & Access

Chula Vista Schools

Harborside, Kellogg and Montgomery Elementary · Chula Vista, California

Chula Vista Schools

Galvanized handrail and guard on a campus ADA ramp — the kind of access work In-Line builds on school sitesRead the case study →

Project Case Study · Federal · Perimeter Security

Coast Guard Base San Diego

Building F, North Harbor Drive · United States Coast Guard

Coast Guard Base San Diego

Repaired the waterfront perimeter fence line — anti-climb ornamental steel with concertina wire, plus the boat-ramp gate.Read the case study →

Project Case Study · Public Park · Ramona, California

Collier Park

Ramona, California · In-Line's own town

Collier Park

Collier Park, Ramona — backstop, dugout enclosures, interior field fencing and gates. Built by a crew that drives pastRead the case study →

Project Case Study · School District · Design-build Fabrication

Crawford High School Stadium & Athletic Facilities

4191 Colts Way, San Diego · San Diego Unified School District

Crawford High School Stadium & Athletic Facilities

The school's name and its colt, cut from steel and built into the fence itself — not a sign hung on it. Galvanized,Read the case study →

Project Case Study · Transit · Architectural Metal

Downtown Station Platform Modifications

Downtown San Diego · SANDAG & San Diego MTS

Downtown Station Platform Modifications

Finished platform railing running the length of the downtown station, with the MTS passenger information kiosk —Read the case study →

Project Case Study · County Of San Diego · Behavioral Health Facility

East Region Crisis Stabilization Unit

200 S. Magnolia Avenue, El Cajon, California · Owner: County of San Diego

East Region Crisis Stabilization Unit

The finished wall — half-inch 3form Koda XT architectural resin in nine-foot heights, carried on 3b×b3 galvanized steelRead the case study →

Project Case Study · Waterfront · Marine Stainless

$1,096 a Linear Foot. Here Is Why.

Embarcadero Marina Park, San Diego Bay · Port of San Diego

$1,096 a Linear Foot. Here Is Why.

The platform at Embarcadero Marina Park, looking across the bay to Coronado. Every piece of that railing is stainlessRead the case study →

Project Case Study · Federal · Design-build · In-Line As Prime

Los Angeles ARTCC Cooling Tower Catwalk

Palmdale, California · Federal Aviation Administration

Los Angeles ARTCC Cooling Tower Catwalk

Contract DTFAWN-12-C-00208 · Design-Build · SBA 8(a) · In-Line held the contractRead the case study →

Project Case Study · Public Works · Active Transportation

CV Link Multi-Modal Transportation Corridor — Segment 1 Coachella Valley, California · Coachella Valley Association of Governments CV Link in service near La Quinta — the powder-coated cable railing on the right is the barrier between the path and the Whitewater River channel.

CV Link Multi-Modal Transportation Corridor — Segment 1 Coachella Valley, California · Coachella Valley Association of Governments CV Link in service near La Quinta — the powder-coated cable railing on the right is the barrier between the path and the Whitewater River channel.

Read the case study →

Project Case Study · Public Works · Rail

El Portal Undercrossing

El Portal Undercrossing

The finished crossing at dusk — In-Line's Ipe hardwood post-and-cable fence along the rail corridor, galvanizedRead the case study →

Project Case Study · Federal · Department Of Defense

Install Fence Basewide Marine Corps Air Ground Combat Center, Twentynine Palms, California

Install Fence Basewide Marine Corps Air Ground Combat Center, Twentynine Palms, California

Completed perimeter security fence — 9-gauge domestic fabric, three-wire 45° barbed arms, Mojave Desert.Read the case study →

Project Case Study · Bridge · Architectural Fabrication

Laurel Canyon & Foothill Boulevard Bridge Rail

Los Angeles, California · City of Los Angeles, Bureau of Engineering — Bridge Division

Laurel Canyon & Foothill Boulevard Bridge Rail

Laurel Canyon Boulevard. Laser-cut arched panels, mesh infill, hot-dip galvanized, mounted on HSS posts anchoredRead the case study →

Project Case Study · Federal · Design & Construction

Martial Arts Training Pit Marine Corps Air Ground Combat Center, Twentynine Palms, California

Martial Arts Training Pit Marine Corps Air Ground Combat Center, Twentynine Palms, California

The completed training pit — powder-coated steel structure, padded columns, hanging heavy bags and a mattedRead the case study →

Project Case Study · Higher Education · Architectural Fabrication

Mesa Housing Pedestrian & Bicycle Bridge

University of California, San Diego · La Jolla, California

Mesa Housing Pedestrian & Bicycle Bridge

Granite Construction · Hensel PhelpsRead the case study →

Project Case Study · Transit · Federally Funded

Mid-Coast Corridor Transit Project

San Diego, California · SANDAG & MTS

Mid-Coast Corridor Transit Project

A Blue Line trolley at UTC Transit Center — the elevated northern terminus of the Mid-Coast extension. The catenaryRead the case study →

Project Case Study · San Diego Unified · Whole Site Modernization

Monroe Clark Middle School

4388 Thorn Street, San Diego, California · San Diego Unified School District

Monroe Clark Middle School

The finished perimeter at Monroe Clark Middle School — galvanized steel fence and gates, prepped and fitted withRead the case study →

Project Case Study · Transit · Light Rail · Station Infrastructure

Orange Line Station Platform Modifications

Downtown San Diego to Santee · San Diego Association of Governments (SANDAG)

Orange Line Station Platform Modifications

One of the information kiosks In-Line fabricated, in service on the platform — holding the route map, the timetables,Read the case study →

Inside In-Line · Equipment · Capability · Precision

Forty Feet Deep. Three Feet Across. Plumb, the First Time. The equipment In-Line owns — and the reason a fence and railing contractor owns it at all. The E25 — In-Line's own drill rig, mid-hole. Operator in the cab, spotter on the ground, and the first galvanized post already standing behind it.

Forty Feet Deep. Three Feet Across. Plumb, the First Time. The equipment In-Line owns — and the reason a fence and railing contractor owns it at all. The E25 — In-Line's own drill rig, mid-hole. Operator in the cab, spotter on the ground, and the first galvanized post already standing behind it.

Read the case study →

Project Case Study · School District · Open-book Contract

Palm Desert High School

Phase 3, 43-570 Phyllis Jackson Lane, Palm Desert · Desert Sands Unified School District

Palm Desert High School

Palm Desert High School. Galvanized backstop, ornamental tube steel perimeter, gates and hardware — In-Line'sRead the case study →

Project Case Study · Federal · Waterfront

Pier 6 Small Craft Berthing Facility Naval Amphibious Base Coronado, California

Pier 6 Small Craft Berthing Facility Naval Amphibious Base Coronado, California

The gangway at Pier 6 — the access run from the pier deck down to the new floating berthing platform, withRead the case study →

Project Case Study · County Of San Diego · Children's Residential Facility

Polinsky Children's Center Renovations

9400 Ruffin Court, San Diego, California · Owner: County of San Diego

Polinsky Children's Center Renovations

Anti-climb perforated mesh panels with outward-angled picket guard, hot-dip galvanized and painted, added on top ofRead the case study →

Project Case Study · State Highway · Crash Barrier

Route 125 Median Barrier

Lemon Grove, California · California Department of Transportation

Route 125 Median Barrier

The completed barrier run on Route 125 — galvanized steel beam on the median side, installed live to a state highwayRead the case study →

Inside In-Line · Safety · Planning · Accountability

Safety

Safety

Read the case study →

Project Case Study · Aviation · Airport Security

San Diego International Airport

Federal Inspection Facility, 3835 North Harbor Drive · San Diego County Regional Airport

San Diego International Airport

AuthorityRead the case study →

Project Case Study · County · Life Safety

San Gabriel Valley Aquatic Center

La Puente, California · County of Los Angeles

San Gabriel Valley Aquatic Center

Ten-foot tube steel picket fence enclosing the pool deck — galvanized, black powder coated, set on the raised deckRead the case study →

Project Case Study · San Diego Unified · Campus Security Fencing

Scripps Ranch & Lincoln High Schools

Scripps Ranch HS, Treena Street · Lincoln HS, Imperial Avenue, San Diego

Scripps Ranch & Lincoln High Schools

Owner: San Diego Unified School District · Prime: Soltek Pacific ConstructionRead the case study →

Project Case Study · Municipal · Bridge · Pedestrian Safety

Ted Williams Parkway Pedestrian Overcrossing

Shoal Creek Drive, Carmel Mountain Ranch, San Diego · City of San Diego

Ted Williams Parkway Pedestrian Overcrossing

The overcrossing at Shoal Creek Drive. Every foot of railing on the deck, the approach ramps and the wall — 1,520Read the case study →

Project Case Study · Commercial Interior · Structural Glass

Tempered Glass Stair Railing Attorney's Office

Tempered Glass Stair Railing Attorney's Office

Point-fixed tempered glass guardrail — designed, fabricated and installed by In-LineRead the case study →

Inside In-Line · Culture · Training · Accountability

Anybody Can Say “Gold Standard.” We Pay to Prove It. Four Times a Year.

Quarterly company training · Every quarter, every year, every employee

Anybody Can Say “Gold Standard.” We Pay to Prove It. Four Times a Year.

A quarterly In-Line training session. The whole company in the room. The word on the screen is Accountability. TheRead the case study →

Project Case Study · City of San Diego · Structural Stair Replacement

Tierrasanta Pool Staircase Replacement

Tierrasanta, San Diego, California · City of San Diego JOC Task S18005

Tierrasanta Pool Staircase Replacement

What was under the paint. The stair pans and the stringer had corroded from the inside out — thirty years ofRead the case study →

Project Case Study · University · Stainless Steel Railing

We Installed It Before the Concrete Was There.

UCSD North Campus Wedge, Phase 3 · University of California, San Diego, La Jolla

We Installed It Before the Concrete Was There.

North Campus Wedge, mid-construction. #4 brushed stainless stair railing, fabricated in the In-Line shop inRead the case study →

Project Case Study · University · Architectural Stainless

UCSD RIMAC Annex Building & Ball Field

La Jolla, California · University of California, San Diego

UCSD RIMAC Annex Building & Ball Field

The RIMAC Annex at dusk. Brushed stainless cable railing on the stair runs, the landings and the balcony guard —Read the case study →

Inside In-Line · Fabrication · Coatings · Durability

We Build It. Then We Dip It in Molten Zinc. Why every piece of steel we fabricate leaves the shop hot-dip galvanized — and why that decision belongs to us, not to a paint crew three years from now. School handrail, fabricated in the In-Line shop, back from the galvanizing kettle and banded for delivery. Every weld, every joint, every inch of tube — inside and out — is now under zinc.

We Build It. Then We Dip It in Molten Zinc. Why every piece of steel we fabricate leaves the shop hot-dip galvanized — and why that decision belongs to us, not to a paint crew three years from now. School handrail, fabricated in the In-Line shop, back from the galvanizing kettle and banded for delivery. Every weld, every joint, every inch of tube — inside and out — is now under zinc.

Read the case study →

Project Case Study · Municipal · Ornamental Fabrication

Wildomar Cemetery Improvements

Wildomar, California · City of Wildomar, CIP 028-2 & CIP 067-1

Wildomar Cemetery Improvements

The main cemetery entry — automated double gate and matching pedestrian gate, with the City of Wildomar emblemRead the case study →

Inside In-Line · Excavation · Trenching · Augering

Excavation, Trenching & Augering

One Machine. Six Different Jobs a Day. Mini excavator and backhoe work — trenching, sewer, irrigation, footings, augering, rock removal and landscape excavation. Ours, on our trailer, with the attachments already loaded. The E35 on our trailer, ready to go — and look at what is loaded next to it. The auger, the buckets, the thumb. The machine is only half the capability; the attachments are the other half, and they travel with it.

One machine, six jobs a day — mini-excavator and backhoe work on our own trailer, attachments already loaded.Read the case study →

Inside In-Line · Grading · Excavation · Export & Import

Grading, Excavation, Export & Import

We Move the Dirt Too. Grading, excavation, spoils export and soil import — self-performed, on our own iron, by the same company that builds your fence. Our skip loader, in our yard in Ramona, next to our trucks. It is not rented for the week. It does not belong to a subcontractor we hope is available. When your site needs grade, it is on a trailer that afternoon.

We move the dirt too — grading, excavation, spoils export and soil import, self-performed on our own iron.Read the case study →

Inside In-Line · Hydro-excavation · Potholing · Damage Prevention

Hydro-Excavation & Utility Potholing

An Auger Finds the Line by Cutting It. Water does not cut fiber. Hydro-excavation, on our own vacuum trailer — because the cheapest utility strike is the one that never happens. Our hydro-vacuum trailer, in our own yard, with our name on the tank. High-pressure water to cut the soil, vacuum to lift it out, and nothing rotating anywhere near your conduit.

An auger finds the line by cutting it — water doesn’t. Hydro-vacuum potholing, nothing rotating near your conduit.Read the case study →

Inside In-Line · Specified by Name · San Diego Unified School District

Specified by Name — SDUSD

A Specification Tells You What to Buy. This One Tells You Who to Call. San Diego Unified wrote In-Line Fence & Railing into its standard specification for decorative steel fence. We never asked them to.

San Diego Unified wrote In-Line Fence & Railing into its standard specification for decorative steel fence.Read the case study →

Project Case Study · San Diego Unified · Whole Site Modernization

Madison High School Whole Site Modernization

4833 Doliva Drive, San Diego, California · San Diego Unified School District

Madison High School Whole Site Modernization

Madison High School under modernization. Ball field perimeter, backstop, the tall enclosed sport courts and every gateRead the case study →

Project Case Study · San Marcos Unified · Athletic Improvements

Mission Hills High School

1 Mission Hills Court, San Marcos, California · San Marcos Unified School District

Mission Hills High School

Eight courts, fully enclosed, with divider fencing between every pair — and the school's name across the front in gold.Read the case study →

Project Case Study · City of San Diego · Custom Architectural Fence

The Piano Fence City Heights

City Heights Performance Annex · San Diego, California · City of San Diego

The Piano Fence City Heights

The piano fence. Nine feet of welded wire in a deep maroon Kynar architectural finish, with perforated vertical insertsRead the case study →

In the Field

Selected Work

Selected Federal & Military Past Performance

A Documented Track Record

Self-performed contracts across the U.S. Marine Corps, Navy, Army, Air Force, USACE, and VA. Full references & CPARS available on request.

ProjectLocationScopeContract ValueYear
Perimeter Fence — Gate 12 to Gate 13 & South EndSan DiegoFence / Walls$2,628,4012012
Bell Air Force BaseBell, CAStairs / Railings$1,428,5892008
Install Fences Base-Wide — Marine Base29 PalmsFence$711,4332015
CGSD M&R to Building FSan DiegoATFP Fence$399,8712023
Air Traffic Control TowerAir Force Plant 42Fence$386,5832022
Ordnance Storage FacilitiesChina LakeFence$332,5002014
Fort Rosecrans ColumbariumSan DiegoStructural Steel$320,0002016
Bachelor Enlisted QuartersCamp PendletonFence / Railings$206,8202013
Life Guard TowersCamp PendletonGuardrail$202,8932022
ATFP Gate & OperatorMCAS MiramarATFP Auto Gate$183,9332020
SEAL Base GateCoronadoATFP Gate$153,5512018
Mojave River Forks Dam (USACE)HesperiaGuardrail$111,8692021
FAA Catwalk (Government)PalmdaleCatwalk / Railings$105,8272013
VA HospitalLa JollaSafety / Suicide-Prevention Barriers$53,8902007

Values reflect In-Line’s contract amounts as prime or subcontractor. Full 30+ project list, references, and CPARS available on request.

Want References for Your Solicitation?

We’ll provide comparable past-performance references, CPARS where available, and the primes we’ve run with — matched to your job.

Request References